Energy Saving and CO2 Reduction Potential from Partial Bus Routes Reduction Model in Bangkok Urban Fringe
Journal article
Authors/Editors
Strategic Research Themes
Publication Details
Author list: Hoonsiri, Chinnawat; Kiattikomol, Vasin; Chiarakorn, Siriluk;
Publisher: MDPI
Publication year: 2020
Volume number: 13
Issue number: 22
ISSN: 19961073
eISSN: 1996-1073
Languages: English-Great Britain (EN-GB)
View in Web of Science | View on publisher site | View citing articles in Web of Science
Abstract
Bus networks in many capital cities are long distances and partially overlapping with each other. As a result, waiting time is high and energy consumption efficiency is poor. Bus operators in many countries tried to reform their bus routes to reduce waiting time and fuel costs by reducing overlapping bus routes. However, most of the reformed bus routes were complicated, which caused discomfort to passengers to use the bus service. To overcome this problem, this study proposed a new bus reformed model called the Partial Bus Routes Reduction in Urban Fringe Model (PBRU) which was a simple and passenger-friendly route operation. It resulted in 14% of total inbound and 16% of total outbound passengers receiving the benefit of waiting time reduction. Most passengers wait twice at the resident bus-stop and transfer point. As a result, the overall waiting time increased by 0.72–3.75 min. The reduction of fuel consumption was consistent with increasing load factors and dependent on the time period. The bus reform operations during the off-peak hours had more benefits in terms of waiting time reduction, energy-saving potential, and CO2 reduction than during the rush hours.
Keywords
bus line overlapping reduction, bus reform, load factor, the Partial Bus Routes Reduction in Urban Fringe Model (PBRU)