Robust liner ship routing and scheduling schemes under uncertain weather and ocean conditions

Journal article


Authors/Editors


Strategic Research Themes


Publication Details

Author listLi M., Xie C., Li X., Karoonsoontawong A., Ge Y.-E.

PublisherElsevier

Publication year2022

Volume number137

Issue number103593

Start page1

End page17

Number of pages17

ISSN0968-090X

eISSN1879-2359

URLhttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85126141747&doi=10.1016%2fj.trc.2022.103593&partnerID=40&md5=90625855aee999e1b6eb3c3f624c2af5

LanguagesEnglish-Great Britain (EN-GB)


View in Web of Science | View on publisher site | View citing articles in Web of Science


Abstract

Since sailing along the Northern Sea Route (NSR) through the Arctic Ocean comes into reality, commercial shipping developments including opening new liner services along this route have been put on the agenda. However, uncertainties within weather and ocean conditions in this region, especially during temperature-varying seasons, may cause failure to on-time arrivals, resulting unignorable or even unaffordable monetary losses. As a result, these uncertainties will inevitably affect cargo shippers’ willingness of choosing this being-explored route, even if on average its shipping time is much shorter than that of the traditional Asia-Europe shipping lines. In this context, the present paper describes a liner ship routing and scheduling problem considering schedule-sensitive demand and late-arrival penalty for operating incoming NSR shipping lines in the future. By using two types of uncertainty sets, bounded and budget-bounded uncertainty sets, we construct and solve two robust counterparts of this problem. The deterministic model and bounded robust model can be seen as special cases of the budget-bounded robust model when the uncertainty budget is set to null and full, respectively. A multifaceted case study of planning liner shipping routes and schedules along the NSR is conducted to validate the efficacy and efficiency of the proposed models and identify the effects of uncertainty bounds and budgets on the solution performance. The following facts and conclusions are revealed from the optimization results of the case study: The budget-bounded robust model functions the best in the worst condition; low revenue rate and high demand sensitivity are the major factors for excluding a candidate port from the route; the order of a visited port in the route decides the weight of its uncertainty budget on the entire shipping line; setting the uncertainty budget in a decelerative way will enhance the scheduling robustness of solutions. © 2022 Elsevier Ltd


Keywords

Liner Ship Routing and Scheduling


Last updated on 2023-03-10 at 07:37